Working with the Case View

The Case View enables deep, instance-level analysis by allowing you to inspect every individual process execution along with all associated data objects. While structurally similar to the Process View, it shifts the focus from aggregated behavior to a single case perspective—making it possible to trace exact sequences, detect anomalies, analyze batching effects, and validate causal consistency in detail. With flexible representation options, granular KPIs, and object-level drill-down capabilities, the Case View transforms abstract process patterns into concrete, evidence-based insights.

Overview

The Case View is the drill-down version of the process view— here, you can investigate each individual process instance with all the data objects attached to it. The structure of this view is almost identical to the Process View: In the center of the screen is the Main Canvas placed where the process instance is shown with nodes (activity) and connectors (paths). On the left, the instance list ranks all observed instances individually with their unique identifier (or Instance Id) shown here in the list. Selecting a instance in this list leads to the visualization of this instance on the Main Canvas. The instance list is usually very long which means that using the the filter is the best option for picking out specific instances. Nevertheless, pagination on the bottom lets you scan through all instances step-by-step. The right‑hand Representation Panel is your toolbox for changing what the canvas emphasises, while a Case Details section directly beneath the graph surfaces key performance indicators—cycle times, rework rates, custom metrics—whenever you click an activity, event, or path.

Representation Options

The Representation panel lets you tell the story that matters:

Case View: Representation Option

Violation Patterns exposes non‑conformant behaviour by fading in paths in a red colour. You can choose between the following violation patterns: Disarray, Negligence, Rework, and Correction. Read more on the violation patterns here

Hypothetical Behaviour flips the perspective from what did happen to what could have happened. You may reveal optional paths that were allowed by the model but never executed, or flag mandatory steps that the real world skipped. Read more on the hypothetical behaviour and its patterns here

Batching (or bundling) makes it possible to show where originally separate cases converge in one object (or activity). This can occur, for example, if several orders are picked together and placed on one pallet in an order-to-cash process. In this case, the separate cases converge at one point. Bottlenecks or resource bottlenecks can often be identified as a result.

Case Aggregation allows you to define at which level of granularity you want to look at the case. If you select Model, data objects of the same (activity) type are aggregated and summarized with a number shown below the event element. This can reduce the object complexity drastically when you imagine having a customer order that is followed by 1000 order items (cardinality of 1:1000). In case you want to have a drill-down to the object level, you can select the Instance option, so that each individual object is visible on the screen.

Activity Info lets you display more information on the activity and event elements. It helps to steer the analysis in the right direction by showing only the information necessary for what is important.

  • Quantity: Shows average value of Paths (abs.)
  • Rework count: Shows the absolute number of recorded Rework of this particular activity or object
  • Activity relative: Shows average value of Start time (avg./rel.)
  • Activity absolute: Shows average value of Start time (avg./abs.)

Path Info lets you display more information on the path elements.

  • Quantity: Shows average value of Paths (abs.)
  • Cycle time: Shows average value of Transition time (avg.)
  • Cardinalities: Shows a combination out of the various cardinality indicators

Highlighting is an option to bring specific behaviour on the paths more directly into the focus of attention.

  • No highlighting
  • Duration: Creates a color scale using 5 different hues from green to yellow to red. In the legend below, the color tones are assigned specific transit times.
  • Violations: Marks process paths in red where at least one violation has been recorded. This means that at least one transition time between the adjacent activities is in the negative range (read more on the difference between positive and negative times).
  • Simplifications: Colors process paths green where at least one activity was skipped permissibly. This means that the process has taken a shortcut that was previously marked as a permitted skip during dimension modeling.

Export Options

When your exploration crystallises into a finding, you can share it immediately. The Download icon above the canvas offers two outward channels. A BPMN 2.0 export (XML) lets you continue modelling or automation work in any compliant BPM suite, while high‑resolution PNG or JPEG snapshots are perfect for slide decks, wikis, or audit reports. You decide whether to capture the full process or only the current viewport and may even change the background colour so the picture blends seamlessly into corporate templates. Read more on the export options here

Details

By clicking on elements on canvas (activity/event or path) of the case view, you can get a large amount of fine-granular key performance indicators and additional properties: 1) Time-Related key performance indicators, 2) Behavioural-Related key performance indicators, and 3) User-Specific Properties that you select during the Entity Configuration in the Builder

Details on activities

If you click on an activity or event/object, the following information are calculated.

Time-related indicators

NameExplanation
Start time (avg./abs.)Average date of all start times of the clicked process activity. I.e. on average, the execution of these activities started at this time.
Start time (min./abs.)Earliest date at which the clicked activity type was ever executed. I.e. it is the start time of the clicked activity type that has the oldest start date.
Start time (max./abs.)Latest date at which the clicked activity type was ever executed. I.e. it is the start time of the clicked activity type that has the most recent start date.
Change time (avg./abs.)Average time of all changes for process cases. This means that, on average, the change was made at this point at the specified time.
Change time (min./abs.)Earliest change date on which the clicked activity type was ever executed. In other words, this is the time of the clicked activity type that has the oldest change date.
Change time (max./abs.)Latest change to the clicked activity type that has ever been made. In other words, this is the change time of the clicked activity type with the most recent change date.
Start time (avg./rel.)Time interval between the average start time of the cases and the average start of the clicked activity type. I.e. on average, it took as long per process as indicated until the clicked activity type is reached.
Start time (min./rel.)Minimum time interval between the start time of the cases and the start of the clicked activity type. I.e. in the shortest case, it took as long as indicated until the clicked activity type is reached.
Start time (max./rel.)Maximum time interval between the start time of the cases and the start of the clicked activity type. I.e. in the longest case, it took as long as indicated until the clicked activity type is reached.
Change time (avg./rel.)Time interval between the average start time of the process cases and the change time of the clicked activity type. This means that on average it took as long as indicated per process until the change to the clicked process activity was made.
Change time (min./rel.)Minimum time interval between the change time of the process cases and the start of the clicked activity type. This means that in the shortest case it takes as long as specified until a change is made to the activity type clicked on.
Change time (max./rel.)Maximum time interval between the change time of the process cases and the start of the clicked activity type. This means that in the longest case it takes as long as specified until a change is made to the activity type clicked on.

Behavioural-related indicators

NameExplanation
TypeName of the activity type.
Paths (abs.)Absolute number of relations (or business objects) that exist between the adjacent activity types or start/end events. I.e. the process (or the business objects contained in it) has run over this path as often as indicated.
Batching included?Indicates that business objects from originally separate cases merge or diverge for the clicked activity type. This means, for example, that two customer orders that were placed independently from each other will run into a single invoice.
Partial batching included?Partial batching indicates that not all cases are part of the batch. This means that, for example, individual business objects from two differently placed customer orders can run into one combined invoice, while others do not. In this example, two customer orders could result in four different invoices, each invoice containing business objects from both orders.
Technical IDTechnical ID of the activity type.

User-Specific Properties

Whether user-specific properties are displayed here is based on the selection of properties made during the entity configuration. The more properties are selected there, the more are also displayed here. If properties are missing here, the import of the entity and then the dimension must be retriggered.

Details on paths

If you click on a path, the following information is calculated.

Time-related indicators

NameExplanation
Transition time (avg.)Average duration between the two adjacent activity types based on all cases.
Transition time (min.)Shortest duration of a case between the two adjacent activity types.
Transition time (max.)Longest duration of a case between the two adjacent activity types.

Behavioural-related indicators

NameExplanation
Paths (abs.)Absolute number of relations (or business objects) that exist between the adjacent activity types or start/end events. I.e. the process (or the business objects contained in it) has run over this path as often as indicated.
Inbound cardinality (min.)Is to be read in combination with the remaining three cardinality specifications. The minimum incoming cardinality describes the minimum number of business objects that have flowed out of the previous activity (or start/end event). I.e. if it says e.g. 3, it means that there are no business cases where less than 3 business objects resulted from the previous activity type.
Inbound cardinality (max.)Is to be read in combination with the remaining three cardinality specifications. The maximum incoming cardinality describes the maximum number of business objects that have flowed out of the previous activity (or start/end event). I.e. if it says e.g. 24, it means that there are no cases where more than 24 business objects resulted from the previous activity type.
Outbound cardinality (min.)Is to be read in combination with the remaining three cardinality specifications. The minimum outgoing cardinality describes the minimum number of business objects that flowed into the subsequent activity (or start/end event). I.e. if there is e.g. 8 here, it means that there are no cases where less than 8 business objects have flowed into the subsequent activity type.
Outbound cardinality (max.)Is to be read in combination with the remaining three cardinality specifications. The maximum outgoing cardinality describes the maximum number of business objects that flowed into the subsequent activity (or start/end event). I.e. if there is e.g. 123 here, it means that there are no cases where more than 123 business objects have flowed into the subsequent activity type.
Process violation presentIndication of whether violations occurred at the selected point in the process that violate the predefined standard in the process template. The clicked process path appears red in the process model at this point. I.e. if activity A was originally supposed to take place before activity B, but in reality only takes place afterward, there is a process violation.
Associated with process pattern “Negligence”The clicked path is directly or indirectly linked to a process pattern of the “Negligence” type. This means that certain activities were inadvertently skipped.
Associated with process pattern “Simplification”The clicked path is directly or indirectly linked to a process pattern of the “Simplification” type. This means that certain activities have been permissibly skipped.
Inbound cardinality (max.) for positive timesIs to be read in combination with the remaining three cardinality specifications. The maximum incoming cardinality for positive times describes the maximum number of business objects that have flowed out of the previous activity (or start/end event). I.e. if it says e.g. 24, it means that there are no cases where more than 24 business objects resulted from the previous activity type.
Outbound cardinality (max.) for positive timesIs to be read in combination with the remaining three cardinality specifications. The maximum outgoing cardinality for positive times describes the maximum number of business objects that flowed into the subsequent activity (or start/end event). I.e. if there is e.g. 123 here, it means that there are no cases where more than 123 business objects have flowed into the subsequent activity type.
Inbound cardinality (min.) for positive timesIs to be read in combination with the remaining three cardinality specifications. The minimum incoming cardinality for positve times describes the minimum number of business objects that have flowed out of the previous activity (or start/end event). I.e. if it says e.g. 3, it means that there are no business cases where less than 3 business objects resulted from the previous activity type.
Outbound cardinality (min.) for positive timesIs to be read in combination with the remaining three cardinality specifications. The minimum outgoing cardinality for psotive times describes the minimum number of business objects that flowed into the subsequent activity (or start/end event). I.e. if there is e.g. 8 here, it means that there are no cases where less than 8 business objects have flowed into the subsequent activity type.
Number of paths with positive timesThe number shown refers exclusively to the paths for which positive (causal) times were calculated.