title: "Tutorial P2P Expert - Bundling and Sharing Process"
url: "https://docs.noreja.com/en/article/p2p-expert-tutorial-bundling-and-sharing-process"
language: "en"
last_updated: "2026-09-22T10:47:15.375Z"
---

# Tutorial P2P Expert - Bundling and Sharing Process

> **TL;DR**   
> **Goal:** Bundle several invoices into regular common approval runs.   
> **Prerequisites:** The Expert P2P model is built and the invoices contain `freigabelauf_id`.   
> **Result:** All invoices due up to a given run are assigned to the next weekly approval run on Friday at 09:00.

## The business question

Not every activity is executed immediately as soon as a single object is ready.

In many companies, invoices, for example, are collected and then processed together in a regular run.

The business question is:

**How does the process picture change when invoices are processed not independently of one another, but collected in periodic approval runs?**

For this scenario we use:

`08 Bundling`

## Desired data picture

Without bundling, invoices are considered as individual objects:

`Rechnung A`

`Rechnung B`

`Rechnung C`

With bundling, several invoices should be assigned to a common run:

`Rechnung A ─┐`

`Rechnung B ─┼→ Freigabelauf Freitag 09:00`

`Rechnung C ─┘`

The approval run thereby itself becomes a business object.

Several invoices reference the same:

`freigabelauf_id`

This creates a genuine **N:1 relationship**.

## 1\. Opening Bundling

Switch to: `08 Bundling`

and enable: `Generate collection run`

The Smart Data Forge describes bundling as a periodic collection run: all objects due up to a given appointment are assigned together to one run. Unlike with the capacity bottleneck, there is no limited slot capacity here.

This means:

**Capacity Bottleneck**

→ An appointment can become full.   
→ Surplus objects have to wait.

**Bundling**

→ All due objects are taken in.   
→ No one waits because of a capacity limit.

## 2\. Selecting invoices as the objects to be collected

Set:

**Which objects are collected?** `rechnung`

**When does an object become due?**  `rechnung_freigegeben_am`

This way an invoice counts as ready for the next collection run from its approval onward.

The prepared P2P Expert configuration uses exactly this combination.

![](https://cdn-assets.productfruits.com/b449bfd8-9982-4bff-9237-aacf557eefa7)

## How is an invoice assigned to a run?

The bundling logic looks, for each invoice, for the **first run whose point in time is equal to or later than** `**rechnung_freigegeben_am**`.

Example:

An invoice is approved: `Mittwoch 14:00`

The next run takes place: `Freitag 09:00`

The invoice is therefore assigned to this Friday run. 

Another invoice, by contrast, is not approved until: `Freitag 11:00`. 

The 09:00 run is already over.

It therefore lands in the: `Freigabelauf der folgenden Woche`.

## 3\. Creating a new collection object

At:

**Target table:** choose: `Create new table`

**Collection object table:** `freigabelauf`

**Execution timestamp (on the collection object):** `freigabe_am`

**Role/group column (optional):** `rolle`

The table does not have to be created beforehand under `Define Tables`.

It is created automatically when the generated bundling SQL is executed.

![](https://cdn-assets.productfruits.com/de451a3e-7607-4dad-b0ed-c00ccdbeb685)

## What does `freigabelauf` contain?

In our scenario, the SQL generates a table with information such as:

`freigabelauf_id`

`freigabe_am`

`rolle`

`anzahl`

Here `anzahl` stands for the number of invoices that were assigned to this run.

Example:

| freigabelauf\_id | freigabe\_am | rolle | anzahl |
| --- | --- | --- | --- |
| 1 | Freitag 09:00 | Kreditoren | 7 |
| 2 | Freitag 09:00 | Kreditoren | 11 |
| 3 | Freitag 09:00 | Kreditoren | 5 |

This later allows analyzing not only the individual invoice, but also the **collection run itself**.

## 4\. Connecting invoices with the approval run

**Link on the business object (FK):** `freigabelauf_id`

After generation, the bundling SQL writes the ID of the assigned run back into the respective invoice.

This creates:

`rechnung.freigabelauf_id`

→ `freigabelauf.freigabelauf_id`

Several invoices can point to the same approval run.

It is exactly this that creates the desired N:1 structure.

## 5\. Configuring the weekly run

**Run hour:** `9`

**Frequency:** `weekly`

**Weekday**: `friday`

**every Friday at 09:00**.

## 6\. Assigning a role

`Roles/groups (round-robin per run)` : `Kreditoren`

This gives the generated approval run:

`rolle = Kreditoren`

The engine supports several roles and would distribute these per run in a round-robin procedure. For our P2P example, however, we deliberately use only one role.

## The finished configuration

| Setting | Value |
| --- | --- |
| Generate collection run | enabled |
| Which objects are collected? | `rechnung` |
| When does an object become due? | `rechnung_freigegeben_am` |
| Target table | `Create new table` |
| Collection object table | `freigabelauf` |
| Execution timestamp | `freigabe_am` |
| Role/group column | `rolle` |
| Link on the business object | `freigabelauf_id` |
| Run hour | `9` |
| Frequency | `weekly` |
| Weekday | Friday |
| Role/group | `Kreditoren` |

![](https://cdn-assets.productfruits.com/a91ecd24-de89-4702-b1b2-a8e6d75c8fc3)

## Capacity Bottleneck vs. Bundling

The two Expert functions look similar at first glance, but model different business situations.

### Capacity Bottleneck

There are fixed appointments **and limited capacity**.

Example:

`20 Prüfungen warten`

→ capacity 16

→ 4 inspections move to the next appointment.

The decisive mechanism is:

**resource scarcity.**

### Bundling

There are likewise fixed appointments, but **no capacity limit**.

Example:

`20 Rechnungen warten`

→ Freitag 09:00

→ all 20 invoices are processed in the run.

The decisive mechanism is:

**deliberate collecting up to a periodic appointment.**

Thus capacity and bundling both create temporal clusters, but from completely different causes.

## What does bundling change on the invoice?

Bundling does not simply generate a new timestamp on each invoice at random.

Instead, we generate a separate business object: `freigabelauf`

and link the invoice to this object via: `freigabelauf_id`.

The run has its own: `freigabe_am` timestamp.

This way, several invoices can reference exactly the same run.

This is particularly interesting for causal process mining, because the collection run is preserved as an independent object.

## Generating the bundling SQL

Click: `Generate bundling SQL`

The bundling is generated – just like the capacity logic – as a separate SQL script.

![](https://cdn-assets.productfruits.com/bb057478-0359-42ce-8492-6586d8647bfd)

## Order of the SQL scripts in the Expert scenario

For our complete Expert scenario we use the following order:

`data.sql`

→ generates the actual P2P data

`capacity.sql`

→ generates inspection-station backlog, delay propagation and cash-discount loss

`bundling.sql`

→ assigns the invoices that then exist to the approval runs.

This order is sensible for our scenario, because the capacity SQL can change `rechnung_freigegeben_am`. The bundling should then work with the already-updated invoice times.

## What should I later see in Noreja?

In Noreja, several invoices should run toward the same:

`freigabelauf`

.

Typical patterns are:

`Rechnung A ─┐`

`Rechnung B ─┼→ Freigabelauf`

`Rechnung C ─┘`

This allows analyzing, for example, the following questions:

**How many invoices are processed on average per approval run?**

**How long does an invoice wait between its approval and the next approval run?**

**Which weekdays or run times systematically create waiting time?**

**How strongly does the volume of the individual approval runs fluctuate?**

**Which invoices narrowly miss a run and have to wait almost an entire week?**

This last case in particular shows a typical bundling effect:

An invoice at:

`Freitag 08:55`

can still be assigned to the run at:

`09:00`

.

An invoice at:

`Freitag 09:05`

by contrast, has to wait until the next weekly run.

## Common mistakes / things to watch out for

**Do not confuse bundling with capacity.**   
With the approval run there is no capacity limit. All due invoices are taken in.

**Use the correct due timestamp.**   
For our example this is `rechnung_freigegeben_am`.

**Set** `**freigabelauf_id**` **as the link.**   
Only this creates the relational connection between invoice and collection run.

**Observe the SQL order.**   
In the complete Expert scenario, `bundling.sql` should be executed after the capacity SQL, so that already-propagated invoice times are taken into account.

## Result

Our Expert data set now contains two different kinds of joint processing:

**Capacity Bottleneck**

→ several objects compete for a limited resource.

**Bundling**

→ several objects are deliberately collected up to a common processing appointment.

The approval run thereby itself becomes a business object and connects several invoices via a genuine N:1 relationship.

With this, the **Expert part of the demo training is complete**.

## Concluding the Expert model

Save the current state as:

`Config 3 – Expert`

The Expert model now contains, in addition to the Simple model:

**PHYSICAL and SOFTWARE procurement paths**

**goods-receipt inspection**

**capacity bottleneck**

**backlog**

**delay propagation**

**calculated cash-discount loss**

**bundling with weekly approval runs**

With this, the complete training model is ready for the subsequent analysis in Noreja.